Skip Navigation

Thameslink

Departures
Arrivals
There are also planned engineering works for today Check before travelling
Last updated: 09:02

Journey Types
Travel Dates
Outbound
Outbound
Today
Dep
Return
Return
Today
Dep
Passengers

You cannot select more than 9 passengers

Railcards

You cannot select more railcards than passengers

Add a railcard

Service updates

Up-to- the-minute information about current engineering works and any other service disruptions on Thameslink.

Check live departures or arrivals at any station

Departures

  • No Thameslink service through Central London until the end of the day
    Show details
    Hide details

    Engineering work is taking place between West Hampstead Thameslink and Loughborough Junction. As a result of this, ALL LINES between London St Pancras International and London Blackfriars are closed today.

    Trains will run between Bedford / Luton and London St Pancras International. However, trains will be diverted to use the East Midlands Trains' platforms at London St Pancras International and will not call at Kentish Town.

    Customers travelling to and from Kentish Town should use a connecting bus service which will run between West Hampstead Thameslink and London St Pancras International, calling at Kentish Town.

    Two trains per hour will operate between London Bridge and Brighton.

    Two trains per hour will operate between London Blackfriars and Sutton via Wimbledon (with the exception of the 09:13, 09:49 and 10:19 services which will depart from London Bridge).

    Two trains per hour will operate between London Victoria and Sevenoaks.

    Ticket acceptance to help you with your journey:

    Customers travelling to / from Sutton via Mitcham Junction should use Southern trains.

    Customers may use the London Underground to travel through central London on any reasonable route.

    Rail replacement buses will run between London St Pancras International and London Bridge outside London Underground hours.

    More information about the amended timetable in place can be found on the National Rail Enquiries website and on the Thameslink website.

    Check before you travel:

    You can plan your journey using the National Rail Enquiries Journey Planner

    You can plan your journey on London Underground by using the Transport for London Journey Planner

    Twitter:
    If you would like to follow information on Twitter, please use #Blackfriars

    Last updated: 00:07

Engineering work for Today

No Thameslink service through Central London on Sunday 22 October

Date:
21 October 11:00 PM - 22 October 2017 10:59 PM

Routes affected:
Thameslink between Bedford and Brighton / Sutton and between London Blackfriars and Sevenoaks

Network Rail is carrying out engineering work between West Hampstead Thameslink and Loughborough Junction. As a result of this, ALL LINES between London St Pancras International and London Blackfriars are closed.

Trains will run between Bedford / Luton and London St Pancras International. But trains will be diverted to use the East Midlands Trains platforms at London St Pancras International and will not call at Kentish Town. For customers travelling to and from Kentish Town, a connecting bus service will run between West Hampstead Thameslink and London St Pancras International calling at Kentish Town.

Two trains per hour will operate between London Bridge and Brighton.

Two trains per hour will operate between London Blackfriars and Sutton via Wimbledon (with the exception of the 09:13, 09:49 and 10:19 services which will depart from London Bridge).

Two trains per hour will operate between London Victoria and Sevenoaks.

Customers travelling to / from Sutton via Mitcham Junction should use Southern trains.

Customers may use London Underground to travel through central London on any reasonable route. Rail replacement buses will run between London St Pancras International and London Bridge outside London Underground hours.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can plan your journey on London Underground by using the Transport for London Journey Planner

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.

Major engineering work at London Bridge affecting Thameslink until January 2018

Date:
5 January 2015 - 31 January 2018 11:59 PM

Routes affected:
All routes via London Bridge

As part of the government sponsored Thameslink Programme, Network Rail are rebuilding London Bridge mainline rail station to provide more space, improved connections to more destinations and more reliable services. The rail and tube station will remain open during the work.

Until 2018, there will be long and short term changes to train services as major track work takes place around London Bridge station.

See the Thameslink Programme website for more information.

To check for future disruptions visit the planned engineering works page.

Other disruptions

12 Train formation updates

  • 07:36 Brighton to London Bridge due 08:53

    Facilities on the 07:36 Brighton to London Bridge due 08:53.
    Will be formed of 12 coaches instead of 8.

  • 09:07 London Bridge to Brighton due 10:21

    Facilities on the 09:07 London Bridge to Brighton due 10:21.
    Will be formed of 12 coaches instead of 8.

  • 10:44 Brighton to London Bridge due 11:57

    Facilities on the 10:44 Brighton to London Bridge due 11:57.
    Will be formed of 12 coaches instead of 8.

  • 12:07 London Bridge to Brighton due 13:21

    Facilities on the 12:07 London Bridge to Brighton due 13:21.
    Will be formed of 12 coaches instead of 8.

  • 13:44 Brighton to London Bridge due 14:57

    Facilities on the 13:44 Brighton to London Bridge due 14:57.
    Will be formed of 12 coaches instead of 8.

  • 15:07 London Bridge to Brighton due 16:21

    Facilities on the 15:07 London Bridge to Brighton due 16:21.
    Will be formed of 12 coaches instead of 8.

  • 16:44 Brighton to London Bridge due 17:57

    Facilities on the 16:44 Brighton to London Bridge due 17:57.
    Will be formed of 12 coaches instead of 8.

  • 18:07 London Bridge to Brighton due 19:21

    Facilities on the 18:07 London Bridge to Brighton due 19:21.
    Will be formed of 12 coaches instead of 8.

  • 19:44 Brighton to London Bridge due 20:57

    Facilities on the 19:44 Brighton to London Bridge due 20:57.
    Will be formed of 12 coaches instead of 8.

  • 21:07 London Bridge to Brighton due 22:20

    Facilities on the 21:07 London Bridge to Brighton due 22:20.
    Will be formed of 12 coaches instead of 8.

  • 22:44 Brighton to London Bridge due 23:56

    Facilities on the 22:44 Brighton to London Bridge due 23:56.
    Will be formed of 12 coaches instead of 8.

  • 00:12 London Bridge to Three Bridges due 00:54

    Facilities on the 23/10/17 00:12 London Bridge to Three Bridges due 00:54.
    Will be formed of 12 coaches instead of 8.

0 Changes to train facilities

No incidents

2 Station updates

  • Angmering: Ticket Office Closure

    At Angmering station, the following issues have been reported:
    The ticket office is closed.
    Ticket Vending Machines are working correctly.

  • Bedford: Lifts out of order

    The lifts are now working between Platform 1 and Main Concourse at Bedford station.

London Underground

Service status

Twitter updates

Sign up for travel alerts

Sign up to get delay and disruption about your journey via SMS and email